< Back to results

RioTinto's closure planning

  • Health and safety
  • Land-use planning
  • Permitting processes / policy integration
  • Reporting official statistics
  • Socio-economic and environmental impact assessments

Challenge the practice is addressing: Every Rio Tinto-managed operation must have a robust closure plan in place. For uniformity in closure planning and management, a comprehensive Closure standard is applied to all of their activities. Additionally, it aids in identifying chances for their actions to have beneficial socioeconomic effects.

Concrete practice to achieve the expected goal: Prepare detailed closure plans for each operation based on the environmental and social settings of each site. Furthermore, RioTinto aims to design a post-closure monitoring programme which includes performance criteria to demonstrate completion of closure to the satisfaction of government and other stakeholders. Its important to updata closure plans on a regular basis throught the operations life cycle.

Expected impact/goal of the practice: By ensuring that sites are left in a state that is consistent with succeeding land uses after operations finish, RioTinto aims to minimize the social and environmental consequences of extraction activities and to give lasting benefits to host communities.

Who is the target user group of the practice/intervention or implementing the practice/intervention? This practice is relevant for extractive companies

Hyperlink
Source
RioTinto website
Year
2022
Data item type
Knowledge base
Practice type
Industry
Format
Website
Learning relevance
Guidelines / guidance document
Commodity
Unspecified (universally applicable)
Extractive life-cycle
Post-exploitation phase (i.e. rehabilitation)
Pre-exploitation / development stage (e.g. feasibility study)
Exploitation phase
Sustainability scope
Planning beyond the mine life
Valuing all forms of capital (i.e. natural and social capital)
Accountability
Transparency
Holistic management and continuous learning
Land-use and biodiversity
Waste management
System change potential
post-closure monitoring programme / planning beyond mine-life